loading...
Логотип Министерства Энергетики
Hotel Continental
Moscow,
22 Tverskaya Street
December 18, 2024
II annual conference

Russian
renewable energy:

energy
transition technologies
energy transition technologies
Отель Continental
Moscow,
22 Tverskaya Street
December 18
2024

About the conference

2022–2024:
Turbulence period
in the Russian economy

The period of turbulence in the Russian economy continues. Despite the gradual adaptation of business and government to sanctions pressure, the current operating mode can barely be called normal. Difficulties with bank transfers within foreign trade transactions including the wide range of equipment import, necessary for the energy infrastructure functioning, makes a negative effect on the investment projects.Both the CapEx and project execution timelines have been increased significantly. The expectations for lower credit interest rates have also not been met: in an attempt to restrain inflation, the central bank more than doubled the key rate relative to the 2023 level. This often makes capital-intensive investment projects unsustainable.

Although Russian renewable energy received a number of additional drivers for development in 2024, the volume of new construction still leaves much to be desired. However, there are some prospects for solar and wind generation, and the key factor here has been the short-term forecast of electricity shortages in some of the regional energy systems and awareness of the industry regulators that it can be quickly covered by construction of solar power plants and wind farms. It is also important that, according to the results of the investment projects selection the new thermal generation facilities were almost twice as expensive as RES generation facilities.

What are the prospects
for solar and wind
generation?

The expansion of wholesale market price zones, in particular the inclusion of the Far East territories, rich with renewable energy sources, will be another major factor in enhancing investment potential. The extension to the new territory of the wholesale electricity and capacity market rules, and therefore the mechanisms for stimulating investments to the new generation construction, including those based on renewable energy, is a good signal for investors to start projects’ development. The estimated medium-term potential of RES generation projects in this region is in the range of 4-5 GW.

Industry development
continues

First half of 2024

2024 brought industry a number of long-awaited news from the industrial sector. At the beginning of the year, the largest in Europe plant of the PV cells and silicon wafers production with the capacity of 1.3 GW/year was commissioned in the Kaliningrad region.

June 2024

The results of the competitive selection of the project for the conclusion of special investment contract for the localization of wind turbines with a unit capacity of 6.25 MW organized by the Ministry of Industry and Trade of Russia were announced in June. The winner was the company «Forward Energy», which plans to launch a new plant in Samara region by 2026.

Autumn 2024

Competitive selection of renewable energy generation projects will be held in the wholesale and retail electricity markets in autumn. The rules will be finetuned in both segments. For the wholesale market, the most important novelty is the new requirement to approve the locations of the generation objects selected earlier. For regional selections on retail markets the mechanism of financial guarantees for applicants will apply. This is a measure designed to increase discipline in the implementation of investment projects.

December 2024

Until the end of 2024 the approval of a number of strategic documents is expected: Energy Strategy-2050, General Plan for the energy facilities placement, Plan of activities for implementation of Low Carbon Development Strategy, as well as national projects «New nuclear and energy technologies», announced by Sergei Tsivilev - new Minister of Energy.

What role will be assigned to renewable energy in the Russian power system in the long term?

Will renewable energy generation become a new “hero” in preventing the local electricity shortages?

What signals will be given to the investors by the Russian government and industry regulators?

Will it be possible to restart regional competitive selection in retail markets and improve their efficiency?

We will try to find answers to these and other questions within the II conference “Renewable Energy of Russia: energy transition technologies”

Audience 120+

Representatives of state authorities, heads of energy and engineering companies, equipment manufacturers, banks, scientific and educational institutions preparing personnel for the energy sector, investors, consultants and market analysts; representatives of leading industry and business media.

Conference
program

09:30 – 10:00

Registration, morning coffee


10:00 – 12:00

Session 1.

Renewable energy industry today and in the future: new regulation - new investment signals


12:00 – 12:30

Coffee break


12:30 – 14:00

Session 2.

The role of renewable energy in the country’s energy balance: How to ensure the ability to cover electricity shortages during the economic growth?


14:00 – 15:00

Lunch


15:00 – 16:30

Session 3.

International cooperation in energy transition: Common objective - common solutions!


16:30–17:30

Award ceremony for the winners of the all-Russian competition for media, internet resources, and bloggers in the field of renewable energy sources and energy transition technologies "TextRES", the photo competition "RES in Focus 2024", as well as the competition for young scientists concerned about the future of the Earth "Renewable Energy of the Planet."


17:30–20:00

Cocktail


Speakers

Mikhail Andronov

CEO
Rusenergosbyt

Ahmed Badr

Project Facilitation and Support Director
International Renewable Energy Agency (IRENA)

Oleg Barkin

Board Member
"NP Market Council" Association

Evgeny Grabchak

Deputy Minister
Ministry of Energy of the Russian Federation

Vadim Dormidontov

First Vice President
Gazprombank

Vasily Zubakin

Head of the Department of Renewable Energy Sources
Gubkin Russian State University of Oil and Gas (National Research University)

Alexey Zhikharev

Director
Russia Renewable Energy Development Association

Vadim Zakrevsky

Director of the Energy Department<br>Eurasian Economic Commission (EEC)

Alexey Kaplun

Director of Energy Development Department
Polyus

Andrey Katayev

Board Member, Director of Energy Markets and External Relations
“System Operator of the Unified Energy System”

Alexander Klimov

Head of Electrified Transport Service
KAMAZ

Vladimir Kolmogorov

CEO
En+

Daniil Krapivin

Director of Development and Projects
Global Energy Association

Andrey Maksimov

Director of the Department for Electricity Development
Ministry of Energy of the Russian Federation

Grigory Nazarov

CEO
Rosatom Renewable Energy

Natalia Nevmerzshitskaya

Chair of the Board
Association of Guaranteed Suppliers and Energy Service Companies

Alexandra Panina

Chair of the Supervisory Board
Association "Council of Energy Producers"

Roland Roesch

Director of the Innovation and Technology Centre (IITC)
International Renewable Energy Agency (IRENA)

How it was

Location

Hotel Continental

Moscow, 22 Tverskaya Street

*Conference attendees are eligible for a special price at Hotel Continental. Please check details with the manager when registering for the event.

Contacts

Svetlana Chashkina

Conference leader

Olga Drozd

Conference coordinator

Olga Chashkina

Sales Manager for Delegate Participation